Solution
In this project, the client needed to demonstrate the groundwater collected from the weeping tiles is adequately treated prior to discharge to storm sewer and at a permitted flow rate. More specifically, constituents found in the groundwater must not exceed storm sewer bylaw limits.
Net Zero Water worked with TMP to design a turn-key groundwater system appropriate for the site and meeting site constraints. Net Zero Water provided concepts and options, drawings and written specifications.
The final Net Zero Water treatment design was heavily influenced by the need for sustainable operation and maintenance. The treatment system minimizes the use of consumables by eliminating the use and need for chemical handling as well as the use of potable water for backwashing. The Net Zero Water design was optimized to be compact, configured for ease of maintenance, skid mounted and fabricated with stainless steel piping and fittings, and integrated with Net Zero Water control panel with colour HMI screen with communications to Building Automation System. The Net Zero Water’s turn-key solution includes system commissioning and training.
Additional Opportunity
As part of all Net Zero Water’s turn-key solutions, system commissioning, testing and training is included in the purchase of the system to ensure system operation and reliability for years to come.