Solution
With no municipal water infrastructure available, Net Zero Water needed to use well water as a source of potable water for the building.
Accordingly, Net Zero Water designed a system for the facility that fit its potable water use needs. To avoid needing a permit to deliver the facility’s water, Net Zero Water developed a well system for a maximum treatment flow rate of 8gpm stored in a 1,000 US gallon day tank to meet a maximum design capacity of 100gpm. The day tank water is boosted with booster pumps and polished with a final disinfection system before distribution to the potable water system.
Additional Opportunity
As part of all Net Zero Water’s turn-key solutions, system commissioning, testing and training are included in the purchase of the system to ensure system operation and reliability for years to come.